In the spring of 2023, construction began at the Transfer Station to rebuild the failing retaining wall and to reconfigure the overall layout in order to reduce congestion and provide greater controls and efficiency in operations. Construction was completed in the fall of 2023 with minor loose ends wrapped up in early 2024.